Production today SYNTHETIC PROJECTS
Six live projects across audio collection, transcription, video and annotation. Each row compares the run rate of the last 7 days with the rate needed to hit the deadline. Pick a project for its burn-up, language split and the actions for today.
Burn-up
Actions for today
Escalation to management
QA batches before handoff SYNTHETIC BATCHES
Every batch is sampled before it goes to the client. Sample size and accept number follow a simplified ISO 2859-1 single sampling plan (general level II, normal inspection). The Wilson interval shows how sure the sample is about the true defect rate.
Batch
Note
Sampled items
Transcript check RUNS IN YOUR BROWSER
Paste the gold reference and a contributor's transcript. The checker aligns them word by word (or character by character for Chinese and Japanese) and reports WER or CER with every substitution, deletion and insertion marked. Use it for spot checks, gold tasks and calibration with reviewers.
Reference (gold)
Contributor transcript
Contributors SYNTHETIC ROSTER
Quality, speed and integrity signals for the current pay period. A spam score adds up independent signals, so one odd number never removes anyone on its own. Pick a contributor to see the evidence and a feedback message.
Contributor
Message
Pay verification · period 14 to 27 Nov 2026 SYNTHETIC TIMESHEETS
Hours claimed are checked against active time logged by the tool and against accepted output before anything goes to payroll. Hourly projects pay verified hours; collection and video pay per accepted unit. Rates are placeholders.
Onboarding cohort · week of 30 Nov SYNTHETIC APPLICANTS
New contributors recruited for the Afrikaans and Tagalog gaps. Activation needs the qualification test, a language check, a device check for audio work and identity verification. Each applicant gets the next step written out.
Onboarding checklist
Message
Supply plan by project and language
Headcount needed to finish on time, from the remaining volume, days left and output per active contributor over the last 7 days. The funnel converts a gap into applicants to recruit. Edit the funnel to match the market.
Recruiting request
Guidelines, FAQ and tool issues
QA error tags from the last 14 days, ranked. The top tags become guideline edits and FAQ entries; tool problems go to engineering with a repro and the cost to production.
Error tags, last 14 days
Proposed FAQ and guideline edits
Tool issues reported to engineering
Weekly report to management
Built from the same numbers as every other tab: progress, quality, contributors, supply, risks and asks. Copy it into a doc or email, or download the trackers as CSV for Google Sheets.
Data & method
What is real and what is synthetic
- Synthetic: every project, client, contributor, batch, timesheet and applicant. Names are invented. Volumes and rates are plausible for remote freelance data work and are seeded, so the page is the same on every load.
- Real and working: the WER and CER checker (Levenshtein alignment in the browser), the acceptance-sampling decision and Wilson interval, the spam score, pay verification rules, the supply funnel and every generated message and report.
- No data leaves the browser. Decisions you change are kept in local storage only.
Rules used
- Project status: ETA from the 7-day accepted run rate. On track if ETA is 2 or more days before the deadline, Watch if within 2 days, At risk if after.
- Spam score: too fast (under 0.4 of project median time) 3, gold accuracy under 70% 3, unedited machine draft (similarity over 0.97) 3, duplicate audio or video fingerprints 4, claimed hours over 125% of logged 2, QA under 80% 2. Score 6 or more: remove and hold pay for review. 3 to 5: probation. QA under 90%: coach.
- Pay: claimed within 110% of logged and output normal: approve. Over 110%: pay logged plus 10% and note it, unless a known timer bug explains the gap and output per claimed hour is normal. Output per hour under half the project median, or spam score 6 or more: hold.
- Supply: needed active = required daily volume divided by 7-day output per active contributor, plus buffer. Applicants = gap divided by test pass rate times activation rate. Recruits only help if they ramp up before the deadline.
Why it is built this way
- The role is measured by on-time delivery, QA pass rate and contributor retention, so those three lead the first tab.
- Each tab maps to one duty in the posting: production and delivery (1), quality (2, 3), contributor management (4), verify hours before payment (5), onboarding (6), supply planning (7), process and tool issues (8), reporting (9).
- Trackers export as CSV and as tab-separated text that pastes straight into Google Sheets.
About
Built by Edward Tay for an application to an operations role. It is an independent prototype and is not affiliated with or operated by any data vendor or client. The homework page is at perle.edwardtay.com.